Two Cambridge condo bathrooms made Architectural Digest. Here's what I'd copy.

A Cambridge couple's green and blue tiled bathrooms got national attention. What made them work, and the hidden work any Boston bathroom needs.

Powder room with deep blue walls, a blue and white patterned tile floor, a wall-mounted white sink on a black metal stand and a wall sconce
A powder room renovated by Magno & Co. Not one of the Cambridge bathrooms in this story.

This fall the Boston Globe ran a story I've been thinking about ever since. A Cambridge couple renovated the two bathrooms in their condo, and people noticed. A lot of people.

We didn't build these bathrooms. But I build bathrooms a few blocks away, in the same kind of old houses, so here's what I'd take from them and what I'd add from the job site.

What happened

The couple bought their condo in 2019. In 2024 they decided to redo the main bathroom and turn part of a pantry under the stairs into a powder room. They worked with Doug Jack of Nidify Studio, a Boston design firm.

The main bath got green tile. The powder room got bright blue tile. Both came from Heath Ceramics in California, where each tile is made by hand. According to the Globe, the main bathroom later appeared in a January Architectural Digest roundup of shower tile ideas, and Heath features both rooms on its website. On a trip to San Francisco, one of the owners stopped at Heath's store and the cashier recognized the bathrooms.

The whole project, two bathrooms plus the pantry, came in under $91,000. That figure and the details above come from the Globe's reporting, also published on Boston.com.

Why those bathrooms work

  • They committed to a color. Green in one room, blue in the other. Not beige to play it safe. A confident choice, done well, reads as designed.
  • One material carries the room. The tile is the design. When the main surface is that good, you don't need much else on the walls.
  • Two rooms, two personalities. They didn't copy one design into both. Each room has its own color, with the same level of care.
  • They spent on what you touch and see. The Globe lists the splurges: the tile, radiant floor heat, a shower with precise temperature control and a concrete sink.
  • They saved on structure. They kept the original footprint, skipped moving a wall and turned the toilet 90 degrees to tuck it out of view instead of relocating plumbing.

That last point is the one I'd underline. Keeping fixtures where they are is the biggest money-saver in any bathroom. Moving a toilet in an old Cambridge or Somerville building means new drain and vent lines through old floors.

One thing they'd do differently

They renovated both bathrooms at the same time. That meant months with no working bathroom at home. They showered at a neighbor's apartment for seven months, and the couple told the Globe they shouldn't have done both at once.

If you only have one full bath, plan the order. Sometimes we finish the powder room first so the house always has a toilet. Sometimes it's better to do the full bath alone and come back later. Ask your builder for a schedule before you sign, and look at my bathroom remodel timeline to see where the weeks go.

The work nobody photographs

A magazine photo shows tile. It doesn't show what's behind it. That hidden work decides whether the tile still looks good in fifteen years.

  • Waterproofing. In a shower, the tile and grout are not the waterproof layer. A membrane behind the tile is. We flood test the shower pan before any tile goes down.
  • Slope. A shower floor has to pitch to the drain, usually a quarter inch per foot. Get it wrong and water sits in the corners.
  • Substrate. Wet walls need cement board or foam board, not regular drywall. Floors need to be stiff. Old joists that bounce will crack tile and grout.
  • Ventilation. A fan sized for the room, ducted outside. Not into the attic, and not a fan nobody turns on because it's loud.

In a condo, there's another reason to get this right. A leak in your bathroom becomes your downstairs neighbor's ceiling.

Handmade tile: plan for the wait and the labor

Handmade tile is beautiful because no two pieces are the same. That's also why it takes more planning.

  • Lead time. Handmade tile is often made to order. Depending on the maker and the color, it can take weeks or months to arrive. Get a ship date in writing before demolition starts.
  • Overage. Order extra, and order it all at once. Color can shift from batch to batch, and a reorder may not match.
  • Labor. Irregular edges and sizes take longer to set. Trim pieces, niches and patterns add hours. The labor to install good tile can rival the cost of the tile itself, so budget for both.
Builder's tip: When handmade tile arrives, open every box and lay pieces out on the floor before setting. Mixing boxes as you go spreads out the color variation so you don't end up with one dark wall.

Condo board approval in Cambridge

There's no citywide condo approval process in Cambridge. Your association's master deed, bylaws and rules decide what needs sign-off. In my experience a bathroom almost always goes to the board when it involves:

  • Shared plumbing, like the main drain stack that serves every unit
  • The floor structure, or hard flooring that may need a sound underlayment
  • Exhaust ducts through an exterior wall

Most associations also set work hours and ask for hallway protection and notice to neighbors.

Get the approval in writing before you order tile. I cover the details in my guide to condo renovation rules.

Permits

Cambridge's Inspectional Services Department issues building permits through an online portal, and plumbing and electrical permits are pulled by the licensed trades. In Massachusetts even replacing a toilet is permitted plumbing work. If your building was built before 1978, lead-safe rules apply too.

Start with do I need a permit for a bathroom remodel, then read my Cambridge building permit guide for the steps.

What a bathroom like this costs

Under $91,000 for two bathrooms and a pantry, with handmade tile and radiant heat, is a high-end project. Most of the bathrooms I do cost less, because most people choose different finishes. My typical price levels for a standard Greater Boston bath:

  • Refresh: $5,000 to $12,000
  • Mid-level renovation: $12,000 to $18,000
  • Full renovation, down to the studs: $19,000 to $30,000
  • Moving walls or plumbing, or high-end tile and stone: $30,000 and up

For more detail, see my bathroom remodel cost guide for Massachusetts, what a powder room costs and what a small bathroom costs.

The good news from this story: you don't need a big house to get a bathroom people remember. You need one great material, a layout you don't fight, and work behind the walls that holds up.

Planning your own bathroom?

I'm Mateus, a licensed builder based in Davis Square. I renovate bathrooms in Cambridge, Somerville and across Greater Boston, including condos where the board and the neighbors are part of the job. Book a free walkthrough and bring your tile ideas. I'll tell you what it takes to build them right.

Frequently asked questions

Which Cambridge bathrooms were in Architectural Digest?

According to the Boston Globe, a Cambridge couple's main bathroom, tiled in green handmade tile from Heath Ceramics, appeared in a January Architectural Digest roundup of shower tile ideas. Their blue-tiled powder room and the main bath are also featured on Heath's website.

How much did the Cambridge bathroom renovation cost?

The Globe reported the project, a full bathroom, a new powder room and a pantry, came in under $91,000. The splurges were handmade tile, radiant floor heat, a precise-temperature shower and a concrete sink.

Do I need condo board approval to renovate a bathroom in Cambridge?

Usually, if the work touches shared plumbing, floor structure, hard flooring rules or exterior walls. Your master deed, bylaws and rules decide, so check them and get approval in writing before you order materials.

How long does handmade tile take to arrive?

It depends on the maker and the color. Handmade tile is often made to order and can take weeks or months. Get a ship date in writing and order all of it, with extra, before demolition starts.

Do I need a permit for a bathroom remodel in Cambridge?

For most remodels, yes. Cambridge's Inspectional Services Department issues building permits, and licensed plumbers and electricians pull their own permits. In Massachusetts even replacing a toilet is permitted plumbing work.

Planning work in Cambridge? See how I work as a general contractor in Cambridge, MA.

See how I remodel bathrooms in Somerville and my published prices.

Read this next

  1. Costs & BudgetsHalf bath remodel cost: what a powder room really costs in Greater BostonHalf bath remodel cost in Somerville and Greater Boston: what my clients pay for a powder room refresh or redo, and why adding a new half bath costs more.4 min read · Keep reading →
  2. Costs & BudgetsBathroom Remodel Cost in Massachusetts: What Greater Boston Homeowners Really PayBathroom remodel cost in Massachusetts: 2025 Boston figures, plumbing permits and the hidden cost drivers I find in Somerville and Cambridge homes.4 min read · Keep reading →
  3. Permits & RulesCondo Renovation in Boston: Do You Need Permission to Renovate?Planning a condo renovation in Boston, Somerville or Cambridge? What your master deed and board control, permits, work hours and neighbor tips.4 min read · Keep reading →
  4. Permits & RulesCambridge MA building permit: a step-by-step guide for homeownersHow to get a Cambridge MA building permit: Inspectional Services, the online portal, fees, historic district review, permit lookups and how long it takes.4 min read · Keep reading →
  5. Permits & RulesDo I Need a Permit to Remodel My Bathroom in Somerville or Massachusetts?Do I need a permit to remodel my bathroom? A clear yes/no list for Somerville and Massachusetts: building, plumbing, electrical and lead rules.4 min read · Keep reading →
  6. Kitchens, Baths & ExteriorsHow Long Does a Bathroom Remodel Take? A Week-by-Week Timeline for Greater BostonHow long does a bathroom remodel take? A realistic week-by-week timeline for Somerville and Cambridge homes, from design and permits to final inspection.4 min read · Keep reading →

Have a question about your project?

Plans, a sketch or just an idea — talk to me. You'll get honest advice and a clear written budget and schedule.

Free: a 30-minute call or a walkthrough of your home.

Prefer to write? Send me your project details. I reply within one business day.