Somerville News

Mystic River pedestrian bridge: what the new Somerville–Everett crossing means for you

The Mystic River pedestrian bridge will link Somerville's Draw Seven Park to Everett and Encore. Cost, timeline and what it means for homeowners.

Artist's concept of the Mystic River pedestrian bridge between Somerville and Everett, seen from the riverbank
Artist's concept of the new Mystic River pedestrian and bicycle bridge by Magno & Co — not the official MassDOT design.
Quick answer

In September 2026, MassDOT's board approved a $78.7 million design-build contract for a car-free Mystic River pedestrian and bicycle bridge between Draw Seven Park in Somerville and the Gateway Park trail and Encore Harborwalk in Everett. Construction is expected to take about three years, and the state's parks agency (DCR) will own and maintain it.

If you live in East Somerville, Ten Hills or near Assembly Square, a big change is coming to the riverfront. The long-planned Mystic River pedestrian bridge just cleared a major step, and it will finally give people a direct, car-free way to walk or bike between Somerville and Everett.

Here's what was decided, where the bridge will go, what it costs, and what it could mean for homeowners on our side of the river. The news was reported by Boston.com; the facts below come from that story and from MassDOT's own announcement.

What was approved

On September 23, 2026, the Massachusetts Department of Transportation's Board of Directors approved a $78.7 million design-build contract to build the bridge, according to MassDOT's press release. Design-build means the same team finishes the design and does the construction, so both can move forward together.

Boston.com reported that another roughly $17 million is set aside for contingencies and engineering, bringing the total to about $95.7 million, and that MassDOT expects construction to take about three years. No opening date has been announced yet.

Where the Somerville–Everett pedestrian bridge will go

The bridge will cross the Mystic River between Draw Seven Park in Somerville and the Gateway Park trail and public boardwalk in Everett, next to the Harborwalk at Encore Boston Harbor. MassDOT describes it as closing a missing link where no direct crossing exists today.

Map of the proposed Mystic River pedestrian bridge from Draw Seven Park near Assembly station in Somerville to Encore and the Northern Strand Trail in Everett
Where the proposed bridge lands: Draw Seven Park and Assembly station on the Somerville side, Encore and the Northern Strand Trail in Everett. Illustrative map by Magno & Co, not to scale.

On both sides it ties into paths many of us already use or will use:

  • Assembly Row and the Assembly Square neighborhood
  • The Mystic River Greenway and the Malden River Greenway
  • The Northern Strand Trail toward Malden, Revere and Lynn
  • Everett's Lower Broadway district and the Harborwalk

So yes, the answer to the common question "can you walk from Assembly Row to Encore?" is about to get much simpler. Today you have to go the long way around on busy roads.

What's being built

According to the state's project page, the plan includes:

  • A new steel and concrete river span with room for two-way walking and biking, while keeping boat traffic moving underneath.
  • ADA-accessible path connections, designed for all ages and abilities.
  • Landscaped approaches and plazas with seating, lawn space and plantings.
  • New lighting and wayfinding signs for day and night use.
  • Seawall and shoreline reconstruction and stormwater improvements.

Once it's done, the Department of Conservation and Recreation (DCR) will own and maintain the bridge.

Concept view of people walking and biking on a Mystic River bridge toward Encore Boston Harbor in Everett
How a walk to the Everett side could feel. Artist's concept by Magno & Co — not the official MassDOT design, which is still being finalized by the design-build team.

What it means for Somerville homeowners

I'm a builder, not a real estate agent, so I won't promise what a bridge does to home prices. But here's what I see on the ground in this part of Somerville:

  • Easier car-free trips. Walking and biking to jobs, trails and parks on the Everett side becomes realistic for a lot more people.
  • More attention on the riverfront. New public spaces tend to bring more people and more interest in nearby streets.
  • A few years of construction. If you live near Draw Seven Park, expect work activity at the river edge while it's built.

If you're planning a renovation near Assembly Square or Ten Hills, it's a good moment to think about how you'll use your home in five years: a home office, a rental unit, a basement playroom or a better entry for bikes and strollers.

Builder's tip: Homes close to the Mystic sit near lower, flatter land. Before you finish a basement or add a bathroom below grade, look up your address on the FEMA flood map and plan for drainage, a sump and moisture-resistant materials from day one.

How to follow the project

MassDOT keeps an official project page with documents, meeting materials and a sign-up for updates. That's the best place to watch for a construction start date and any detour notices along the river paths.

Planning work on your own home? Read my guides to getting a building permit in Somerville and what Somerville permits cost.

Need a hand?

I'm Mateus, a licensed builder and owner's representative based in Davis Square. If you're thinking about a renovation in East Somerville, Ten Hills or Assembly Square, book a free walkthrough. You'll get honest advice and a written line-item budget, usually within 48 hours.

Frequently asked questions

Where will the Mystic River pedestrian bridge be?

It will cross the Mystic River between Draw Seven Park in Somerville and the Gateway Park trail and Harborwalk at Encore Boston Harbor in Everett, connecting to Assembly Row and regional trails.

When will the Somerville–Everett pedestrian bridge open?

No opening date has been announced. MassDOT approved the construction contract in September 2026, and Boston.com reported that construction is expected to take about three years.

How much does the Mystic River bridge cost?

MassDOT approved a $78.7 million design-build contract. Boston.com reported about $17 million more for contingencies and engineering, for a total of roughly $95.7 million.

Can cars use the new bridge?

No. It is a car-free bridge for people walking, biking and rolling, designed to be fully ADA accessible.

Have a question about your project?

Plans, a sketch or just an idea — talk to me. You'll get honest advice and a clear written budget and schedule.

Worked with Magno & Co?

A 1-minute Google review helps Somerville neighbors find a builder they can trust, and it means a lot to a small local business.

Call Free consultation