# How Long Does It Take to Get a Building Permit? (MA)

Page: https://magnoandco.com/blog-how-long-to-get-a-building-permit-somerville

> How long does it take to get a building permit in Somerville? The 30-day Massachusetts rule, what slows reviews, hearing timelines and how to speed it up.

Permits & Rules

## How long does it take to get a building permit? Somerville and Massachusetts timing

How long does it take to get a building permit in Somerville? The 30-day Massachusetts rule, what slows reviews, hearing timelines and how to speed it up.

**Mateus Magno**
Licensed Construction Supervisor · October 20, 2026 · 4 min read

"How long does it take to get a building permit?" is one of the first things my Somerville clients ask, right after "how much?" The short answer: in Massachusetts the building official must act on your application **within 30 days of filing**, but that clock only helps you if the application is complete and needs no zoning or historic approval.

A clean, complete permit for interior work can move quickly. Anything that needs a zoning hearing, historic review or engineered plans takes longer. Below is how the rules work, what slows Somerville permits down, and how I keep my clients' projects moving.

## The 30-day rule in the Massachusetts building code

Section 105.3.1 of the [Massachusetts State Building Code, 780 CMR (10th edition)](https://www.mass.gov/doc/10th-edition-residential-chapter-1-scope-and-application/download) requires the building official to review your application and **issue or deny the permit in writing within 30 days of filing**. Here is what that means for you:

- A denial has to be in writing and give the reasons.
- If the official doesn't act in 30 days, the code points to a complaint or an appeal to the state Building Code Appeals Board.
- Under section 105.3.2, an application is treated as **abandoned 180 days after filing** unless you pursue it in good faith. You can ask in writing for extensions of up to 90 days each.

The catch: the 30 days covers the building permit only. Zoning relief and historic approvals run on their own schedules, and those usually have to be done before the building permit is issued.

## What slows down a Somerville building permit

Somerville files building permits through the [Citizenserve portal](https://www.somervillema.gov/citizenserve). In my experience, delays almost always come from one of these:

- **Incomplete applications.** The [Building Division](https://somervillema.gov/departments/isd/building-division) lists required documents: the contractor's CSL, HIC registration for owner-occupied 1–4 unit homes, a signed contract, plans when required, Workplace Safety and Wage Theft affidavits, a Site Safety Plan and OSHA certification. If one is missing, you wait while it gets fixed.
- **Zoning review.** The permit has to show your project meets zoning, including setbacks, frontage and yard size. Porches, decks, dormers and additions get the most attention. My [Somerville zoning guide](https://magnoandco.com/blog-somerville-zoning-explained) explains the basics.
- **Historic review.** Work on a Local Historic District property, or demolishing a building 75 years or older, needs a separate Historic Permit in Citizenserve. That covers much of Somerville's 1900–1930 housing stock. See my guide to [Somerville historic districts](https://magnoandco.com/blog-somerville-historic-districts-exterior).
- **Engineering.** Structural changes like removing bearing walls, new beams or big openings need drawings someone can review. If the plans don't match the existing framing, expect questions.
- **Trade permits.** Electrical, plumbing and gas permits must be pulled by licensed trades. They run alongside the building permit, and one late trade can hold up the job.

MAGNO & CO

Planning a project in Somerville?

Licensed builder & owner's rep · free walkthrough · written budget in about 48 hours.

[Book a free consultation](https://calendar.google.com/calendar/appointments/schedules/AcZssZ3YJnElSsR4HsHaWVd6BsIBm7JOsDl2n-1EMy9trS9rj8PCyepopoQtl6O7um0eJcFcp5XXYk-Z)[Text me a question](sms:+19783975700?&body=Hi%20Mateus%2C%20I%20just%20read%20%22How%20long%20does%20it%20take%20to%20get%20a%20building%20permit%3F%22%20on%20magnoandco.com.%20My%20question%3A%20)[978-397-5700](tel:+19783975700)

## How long does it take to get a building permit approved when you need a hearing?

If your project needs a special permit or a variance, state zoning law sets the outer limits:

| Relief | Public hearing | Decision |
| --- | --- | --- |
| Special permit ([M.G.L. c. 40A, s. 9](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleVII/Chapter40A/Section9)) | Within 65 days of filing | Within 90 days after the hearing |
| Variance or appeal ([M.G.L. c. 40A, s. 15](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleVII/Chapter40A/Section15)) | Within 65 days of the board receiving it | Within 100 days of filing |

Both deadlines can be extended by written agreement. And those days only start once you file, which comes after design and the city's intake. Once you get relief, you still go back to ISD for the building permit itself. That's why I tell clients that a project needing a hearing is measured in months, not weeks.

## A typical Somerville permit sequence

- Walkthrough, scope and existing-conditions measurements.
- Zoning check: does the work fit by right, or does it need relief?
- Historic check: is the property in a Local Historic District, or is anything being demolished?
- Drawings, stamped by an architect or engineer if needed.
- File a complete application in Citizenserve and pay the review fee.
- Answer reviewer comments fast.
- Permit issued and posted on site, then trade permits and inspections.

Want to see how busy the city is? My analysis of [Somerville's 7,174 permits](https://magnoandco.com/blog-somerville-renovation-permits-2026) from the last 12 months shows which project types are most common.

Go deeper · 31-page PDF

Somerville Permits, Explained

Find out if your Somerville job needs a permit, what to file, how long it can take and what it costs. Do it before the hammer comes out.

[Get the guide · $19 →](https://magnoandco.com/ebook-somerville-building-permits-explained)

## How long does it take to get a building permit for a deck?

Decks and porches are rarely slowed down by the carpentry. What slows them is zoning, since setbacks matter in Somerville's tight lots, plus footing and framing details. A rebuild that keeps the same footprint usually moves faster than a new or larger deck. If your porch is failing, read my [porch and stair safety guide](https://magnoandco.com/blog-somerville-porch-stair-safety) first.

## How a contractor or owner's rep speeds it up

- Run the zoning and historic checks **before** design, not after.
- Submit a complete package the first time, with matching costs, plans and affidavits.
- Book the electrician and plumber early so their permits don't lag.
- Answer reviewer comments the same day.

That is a big part of what an [owner's representative](https://magnoandco.com/blog-owners-representative-what-it-is) does.

**Builder's tip:** Never start demolition "just to get ahead" while the permit is pending. Somerville requires permits before work starts. If you open a wall early and find a problem, you may have to redo the plans and start the review again.

## Need a hand?

I pull permits in Somerville, Cambridge, Medford and Greater Boston, and I build the permit timeline into every schedule. [Book a free walkthrough](https://magnoandco.com/contact) and I'll send you a written line-item budget, usually within 48 hours.

## Frequently asked questions

How long does it take to get a building permit approved in Massachusetts?

The State Building Code, 780 CMR 105.3.1, requires the building official to issue or deny a permit in writing within 30 days of filing. Zoning or historic approvals add their own time on top.

How long does it take to get a building permit for a deck?

It depends mostly on zoning and the structural details. A same-footprint rebuild with complete footing and framing plans usually moves faster than a new or larger deck that needs a zoning check or relief.

Can I start work while my building permit is pending in Somerville?

No. Somerville's Building Division says permits must be obtained before work starts and displayed at the job site.

How long is a building permit application valid in Massachusetts?

Under 780 CMR 105.3.2, an application is considered abandoned 180 days after filing unless it is being pursued in good faith or a permit has been issued. The building official can grant written extensions of up to 90 days.

Planning work in or near Somerville?

Text me a question or a photo, or book a free consultation: a 30-minute call or a walkthrough of your home. Licensed MA Construction Supervisor, 5.0 on Google from 9 reviews.

[Text me a question](sms:+19783975700?&body=Hi%20Mateus%2C%20I%20just%20read%20%22How%20long%20does%20it%20take%20to%20get%20a%20building%20permit%3F%22%20on%20magnoandco.com.%20My%20question%3A%20)[Book a free consultation](https://calendar.google.com/calendar/appointments/schedules/AcZssZ3YJnElSsR4HsHaWVd6BsIBm7JOsDl2n-1EMy9trS9rj8PCyepopoQtl6O7um0eJcFcp5XXYk-Z)

[Or send your project details. I reply within one business day →](https://magnoandco.com/contact#quote-form)

See [the towns I work in, with local permit notes](https://magnoandco.com/areas), and [how I price work](https://magnoandco.com/pricing).

Go deeper · 31-page PDF

Somerville Permits, Explained

Find out if your Somerville job needs a permit, what to file, how long it can take and what it costs. Do it before the hammer comes out.

[Get the guide · $19 →](https://magnoandco.com/ebook-somerville-building-permits-explained)

Read this next

- [Permits & Rules**Somerville building permit portal: how to apply, pay, track and search permits** Somerville building permit portal guide: apply on Citizenserve, upload the right PDFs, pay, track status, book inspections and search permits by address.4 min read · Keep reading →](https://magnoandco.com/blog-somerville-building-permit-portal)
- [Home Care & Safety**Renovating in winter in Somerville: which projects make sense and which to wait on** Planning a winter renovation in Somerville? Which interior projects work in the cold, which to save for spring, and how to line up permits now.3 min read · Keep reading →](https://magnoandco.com/blog-somerville-winter-renovation-projects)
- [Permits & Rules**How to get a building permit in Somerville: a homeowner's step-by-step guide** Who can pull the permit, what you'll need, which jobs need one, and the energy-code rules that apply to Somerville renovations — in plain English.3 min read · Keep reading →](https://magnoandco.com/blog-somerville-building-permit-guide)
- [Permits & Rules**The Somerville zoning ordinance explained: a plain-English guide for homeowners** The Somerville zoning ordinance in plain English: where to find the code and zoning map, NR vs UR districts, the ZBA, and rules for dormers and ADUs.4 min read · Keep reading →](https://magnoandco.com/blog-somerville-zoning-explained)
- [Hiring & Planning**How long does a kitchen remodel take? A phase-by-phase Greater Boston timeline** How long does a kitchen remodel take in Somerville and Greater Boston? A phase-by-phase timeline: design, permits, cabinets, inspections and counters.4 min read · Keep reading →](https://magnoandco.com/blog-how-long-does-a-kitchen-remodel-take)
- [Hiring & Planning**What an owner's representative does — and when you need one** You have plans — or a clear idea. Here's who turns them into a finished project, on budget, without you living on the job site.3 min read · Keep reading →](https://magnoandco.com/blog-owners-representative-what-it-is)

**Good to know:** this article is general information, not legal or engineering advice. Rules change and every property is different — confirm the details for your home with your city's building department, or [ask me](https://magnoandco.com/contact). See our [Terms & Disclaimers](https://magnoandco.com/terms).

**About the author**

Mateus Magno founded Magno & Co in 2020. He is a licensed Massachusetts Construction Supervisor (CS-123658), registered Home Improvement Contractor (HIC #220484) and certified Lead-Safe Renovator Supervisor who has renovated and managed over $5 million in projects across Greater Boston.

[More about Mateus →](https://magnoandco.com/about)

Keep reading

## More from the blog

[Permits & Rules ### Certificate of Occupancy in Somerville, MA: What It Is and When You Need One A certificate of occupancy in Somerville MA: what it is, when the City requires one, final inspections, open permits, and how to check permit history. 4 min read · Read article →](https://magnoandco.com/blog-somerville-certificate-of-occupancy) [Permits & Rules ### What Happens If You Remodel Without a Permit in Massachusetts? What happens if you remodel without a permit in Somerville or elsewhere in Massachusetts: stop-work orders, triple fees, opened walls, how to fix it. 4 min read · Read article →](https://magnoandco.com/blog-renovating-without-a-permit-massachusetts) [Permits & Rules ### Egress Window Requirements in Massachusetts: Basement Sizes, Wells and Permits Egress window requirements in Massachusetts: opening size, sill height, window wells and permits for basement bedrooms in Somerville and Cambridge. 4 min read · Read article →](https://magnoandco.com/blog-egress-window-requirements-massachusetts)

## Have a question about your project?

Plans, a sketch or just an idea — talk to me. You'll get honest advice and a clear written budget and schedule.

[Book a free consultation](https://calendar.google.com/calendar/appointments/schedules/AcZssZ3YJnElSsR4HsHaWVd6BsIBm7JOsDl2n-1EMy9trS9rj8PCyepopoQtl6O7um0eJcFcp5XXYk-Z) [Call 978-397-5700](tel:+19783975700) [Text me](sms:+19783975700?&body=Hi%20Mateus%2C%20I%20found%20you%20on%20magnoandco.com.%20)

Free: a 30-minute call or a walkthrough of your home.

Prefer to write? [Send me your project details](https://magnoandco.com/contact#quote-form). I reply within one business day.

[**5.0** 9 Google reviews](https://maps.google.com/?cid=2871062337128281965)

## Worked with Magno & Co?

A 1-minute Google review helps Somerville neighbors find a builder they can trust, and it means a lot to a small local business.

[Leave a Google review](https://g.page/r/CW23iOz7D9gnEAE/review) [Read our reviews on Google →](https://maps.google.com/?cid=2871062337128281965)

---
Magno & Co · licensed owner's representative and builder · 55 Davis Square, Fl 3, Somerville, MA 02145 · 978-397-5700 · info.magnoandco@gmail.com · MA CSL CS-123658 · MA HIC #220484 · https://magnoandco.com/
